LaFleur Minerals Expands Val-d'Or Land Position With Strategic Claims Acquisition

LaFleur Minerals acquires 27 mineral claims adjacent to its McKenzie East Project in Québec's Abitibi Gold Belt, consolidating prospective ground near its Swanson Gold Project and Beacon Gold Mill.

LA Metrowire Staff
Business
LaFleur Minerals Expands Val-d'Or Land Position With Strategic Claims Acquisition

LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) has acquired a 100% interest in 27 mineral claims totaling approximately 701.7 hectares in Québec’s Abitibi Gold Belt. The newly acquired claims are adjacent to the company’s McKenzie East Project in the Val-d’Or mining district and were purchased from an arm’s-length third party for cash consideration of C$35,000.

The acquisition supports LaFleur’s strategy of consolidating prospective exploration ground in the Val-d’Or region. The company is advancing the PEA-stage Swanson Gold Project and preparing the fully permitted Beacon Gold Mill for a return to production. The property hosts the historical Maruska gold showing and contains no associated net smelter return royalty. LaFleur also highlighted plans to resume drilling at the Swanson Gold Deposit following recent results that extended gold mineralization below the current resource and demonstrated continued potential for resource growth.

LaFleur Minerals is focused on the development of district-scale gold projects in the Abitibi Gold Belt near Val-d’Or, Québec. The company’s mission is to advance mining projects with a focus on its PEA-stage Swanson Gold Project and the Beacon Gold Mill. The Swanson Gold Project is approximately 19,214 hectares (192 km2) in size and includes several prospects rich in gold and critical metals previously held by Monarch Mining, Abcourt Mines, and Globex Mining. LaFleur has consolidated a large land package along a major structural break that hosts the Swanson, Bartec, and Jolin gold deposits and several other showings. The Swanson Gold Project is easily accessible by road, allowing direct access to several nearby gold mills. LaFleur’s recently refurbished Beacon Gold Mill is capable of processing over 750 tonnes per day and is being considered for processing mineralized material from Swanson and for custom milling operations for other nearby gold projects.

The company recently released results of a positive Preliminary Economic Assessment (PEA) for the Swanson Gold Project and the planned restart of the Beacon Gold Mill, as detailed in a press release dated March 3, 2026. Additional information is available in the company’s newsroom at http://ibn.fm/LFLRF. The full press release regarding the acquisition can be viewed at https://ibn.fm/udddD.

Blockchain Registration

QR Code for Blockchain Registration